Dekorationsartikel gehören nicht zum Leistungsumfang.
Sprache:
Englisch
48,95 €*
Versandkostenfrei per Post / DHL
Lieferzeit 1-2 Wochen
Kategorien:
Beschreibung
Changeover is the process of setting up a production line for a different process or product. Many plants take hours or even days to do a changeover - a major barrier to manufacturing flexibility. Quick Changeover for Operators, based on Shigeo Shingo's SMED system, teaches frontline employees the techniques and approaches that turn hours of changeover time into minutes, even seconds! Now the learning format in the Shopfloor Series makes these powerful techniques accessible to the whole workforce. SMED is short for "Single-Minute Exchange of Die". The "single" here means a single-digit number of minutes - less than ten. The SMED approach is simple and universal. It works in companies all over the world. Although it was first used in (and named for) manufacturing with dies, the basic principles of SMED have been used to reduce setup and turnaround time in all types of manufacturing, assembly, and even service industries, from process and packaging plants to airlines.
Changeover is the process of setting up a production line for a different process or product. Many plants take hours or even days to do a changeover - a major barrier to manufacturing flexibility. Quick Changeover for Operators, based on Shigeo Shingo's SMED system, teaches frontline employees the techniques and approaches that turn hours of changeover time into minutes, even seconds! Now the learning format in the Shopfloor Series makes these powerful techniques accessible to the whole workforce. SMED is short for "Single-Minute Exchange of Die". The "single" here means a single-digit number of minutes - less than ten. The SMED approach is simple and universal. It works in companies all over the world. Although it was first used in (and named for) manufacturing with dies, the basic principles of SMED have been used to reduce setup and turnaround time in all types of manufacturing, assembly, and even service industries, from process and packaging plants to airlines.
Über den Autor
Shigeo Shingo
Inhaltsverzeichnis
Publisher's Message, Chart: SMED's Conceptual Stages and Practical Techniques, Chapter 1. Getting Started, Chapter 2. Important Terms and Concepts, Chapter 3. Getting Ready for SMED, Chapter 4. Stage 1: Separating Internal and External Setup, Chapter 5. Stage 2: Converting Internal Setup to External Setup, Chapter 6. Stage 3: Streamlining All Aspects of the Setup Operation, Chapter 7. Reflections and Conclusions, About the Authors
Details
Erscheinungsjahr: | 1996 |
---|---|
Medium: | Taschenbuch |
Seiten: | 96 |
Inhalt: | Einband - flex.(Paperback) |
ISBN-13: | 9781563271250 |
ISBN-10: | 1563271257 |
Sprache: | Englisch |
Einband: | Kartoniert / Broschiert |
Autor: | Shingo, Shigeo |
Redaktion: | Productivity Development Team |
Hersteller: | Taylor & Francis |
Maße: | 256 x 180 x 6 mm |
Von/Mit: | Shigeo Shingo |
Erscheinungsdatum: | 01.06.1996 |
Gewicht: | 0,222 kg |
Über den Autor
Shigeo Shingo
Inhaltsverzeichnis
Publisher's Message, Chart: SMED's Conceptual Stages and Practical Techniques, Chapter 1. Getting Started, Chapter 2. Important Terms and Concepts, Chapter 3. Getting Ready for SMED, Chapter 4. Stage 1: Separating Internal and External Setup, Chapter 5. Stage 2: Converting Internal Setup to External Setup, Chapter 6. Stage 3: Streamlining All Aspects of the Setup Operation, Chapter 7. Reflections and Conclusions, About the Authors
Details
Erscheinungsjahr: | 1996 |
---|---|
Medium: | Taschenbuch |
Seiten: | 96 |
Inhalt: | Einband - flex.(Paperback) |
ISBN-13: | 9781563271250 |
ISBN-10: | 1563271257 |
Sprache: | Englisch |
Einband: | Kartoniert / Broschiert |
Autor: | Shingo, Shigeo |
Redaktion: | Productivity Development Team |
Hersteller: | Taylor & Francis |
Maße: | 256 x 180 x 6 mm |
Von/Mit: | Shigeo Shingo |
Erscheinungsdatum: | 01.06.1996 |
Gewicht: | 0,222 kg |
Warnhinweis